Warning: The magic method Vc_Manager::__wakeup() must have public visibility in /customers/5/6/7/ucharge.co.uk/httpd.www/wp-content/plugins/js_composer_theme/include/classes/core/class-vc-manager.php on line 203 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/6/7/ucharge.co.uk/httpd.www/wp-content/plugins/js_composer_theme/include/classes/core/class-vc-manager.php:203) in /customers/5/6/7/ucharge.co.uk/httpd.www/wp-content/plugins/onecom-vcache/vcaching.php on line 630 Warning: Cannot modify header information - headers already sent by (output started at /customers/5/6/7/ucharge.co.uk/httpd.www/wp-content/plugins/js_composer_theme/include/classes/core/class-vc-manager.php:203) in /customers/5/6/7/ucharge.co.uk/httpd.www/wp-content/plugins/onecom-vcache/vcaching.php on line 638 Pricing - uCharge Skip to content

Pricing

At U Charge, we believe in transparent pricing

We offer two different installation packages. The Standard installation or the Superior bespoke installation

Please see our comparison chart below to see the differences between the standard and superior bespoke installation type.

Then use our pricing calculator to get an estimated price for your installation.

olev-grants-home-ev-charging

Installation Type Standard installation Superior bespoke installation
Installation of your chosen point on your property and or inside your garage
Installation on a designated Post
  • A new circuit to be run surface with the cable
  • Clip direct
  • Surface in trunking
  • Underfloor (where possible)
  • Through cupboards boxing in or voids
  • Under units
  • Through loft space
  • The cable run for the new circuit will be a maximum of 10 metres in length
  • Armoured or Hi Tuff cable excluded
  • The cable run for the new circuit will be up to and over 10 meters in length
  • Armoured or Hi Tuff cable terminated
The cable run for the new circuit will be installed at a maximum of 1.8 meters high
The cable run for the new circuit will be installed over 1.8 meters high if required
EV Charger Circuit installed in the exsiting spare way in your fuse box
New dedicated distribution board installed for EV charging circuit
Civil works required
(eg. Trenching, lifting pathing)
Earth rod required and installed
Matt:e O-pen earthing device
Testing, certification and notification